2023 BMW M3 Base at Right Honda
https://research.righthonda.com/cars/Used/2023/BMW/M3/Base/170398882023 BMW M3 Base
Selling Price : $70,644
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 26,945
- VIN : WBS53AY00PFR19746
- Stock # : 00851592
- Engine :
- Transmission : 6-Speed Manual
- Ext. Color : White
- Int. Color : Black
- Vehicle Type : Sedan
- Body Style : 4D Sedan
- Drivetrain : RWD
City MPG *
16
Hwy MPG *
23
*Your mileage will vary depending on driving conditions, how you drive and maintain your vehicle, battery-pack age/condition, and other factors.
Discover the pinnacle of performance and sophistication in this stunning 2023 BMW M3 Base. With its powerful 3.0L I6 Turbocharged engine, delivering an exhilarating 473 horsepower, this vehicle is a true driver's dream. Boasting a sleek, white exterior and a meticulously crafted interior, this M3 is the embodiment of BMW's legendary engineering and design.
- Local trade-in with a clean history report and one owner
- Pristine condition, as clean as a pin
- 19" x 9.5" front and 20" x 10.5" rear M Black wheels
- Carbon fiber trim
- Icon Adaptive LED headlights with Laserlight
- Parking Assistance Package with Parking Assistant Plus
The BMW M3 is renowned for its dynamic handling and exceptional performance, and this model is no exception. With its 6-speed manual transmission and rear-wheel-drive configuration, it delivers an unparalleled driving experience that will leave you craving the open road. The M Compound Brakes with red calipers provide precise, responsive stopping power, while the adaptive suspension ensures a smooth and composed ride, even in the most demanding conditions.
Inside, the M3 pampers you with a host of premium features, including a 16-speaker harman/kardon Surround Sound System, wireless device charging, and a BMW Curved Display that seamlessly integrates your digital experience. The extended Merino leather upholstery and heated front seats add a touch of luxury, while the M Sport seats provide exceptional support and comfort.
This 2023 BMW M3 Base is a true testament to the brand's commitment to performance, technology, and craftsmanship. With its impressive fuel efficiency of 16 city and 23 highway MPG, it offers a winning combination of power and efficiency. Whether you're commuting or seeking the thrill of the open road, this M3 is ready to deliver an unparalleled driving experience.
We invite you to schedule a test drive and experience the true essence of the BMW M3 for yourself. This exceptional vehicle is waiting to be your next automotive companion, ready to elevate your driving passion to new heights. Contact us today to learn more and secure your opportunity to own this remarkable 2023 BMW M3 Base.
- Local trade-in with a clean history report and one owner
- Pristine condition, as clean as a pin
- 19" x 9.5" front and 20" x 10.5" rear M Black wheels
- Carbon fiber trim
- Icon Adaptive LED headlights with Laserlight
- Parking Assistance Package with Parking Assistant Plus
The BMW M3 is renowned for its dynamic handling and exceptional performance, and this model is no exception. With its 6-speed manual transmission and rear-wheel-drive configuration, it delivers an unparalleled driving experience that will leave you craving the open road. The M Compound Brakes with red calipers provide precise, responsive stopping power, while the adaptive suspension ensures a smooth and composed ride, even in the most demanding conditions.
Inside, the M3 pampers you with a host of premium features, including a 16-speaker harman/kardon Surround Sound System, wireless device charging, and a BMW Curved Display that seamlessly integrates your digital experience. The extended Merino leather upholstery and heated front seats add a touch of luxury, while the M Sport seats provide exceptional support and comfort.
This 2023 BMW M3 Base is a true testament to the brand's commitment to performance, technology, and craftsmanship. With its impressive fuel efficiency of 16 city and 23 highway MPG, it offers a winning combination of power and efficiency. Whether you're commuting or seeking the thrill of the open road, this M3 is ready to deliver an unparalleled driving experience.
We invite you to schedule a test drive and experience the true essence of the BMW M3 for yourself. This exceptional vehicle is waiting to be your next automotive companion, ready to elevate your driving passion to new heights. Contact us today to learn more and secure your opportunity to own this remarkable 2023 BMW M3 Base.
Vehicle Features
- Wheels: 18"x9.5" Fr. & 19"x10.5"Rr. M Orbit Gray
- Wheels: 19"x9.5" Fr. & 20"x10.5" Rr M Black
- M Sport Seats
- Extended Merino Leather Upholstery
- Radio: AM/FM Audio System
- Parking Assistance Package
- M Compound Brakes w/Red Calipers
- Moonroof
- Carbon Fiber Trim
- Icon Adaptive LED Headlights w/Laserlight
- Extended Shadowline Trim
- Power Front Seats
- Lumbar Support
- Heated Front Seats
- Parking Assistant Plus
- SiriusXM Satellite Radio w/1 Year Subscription
- harman/kardon Surround Sound System
- BMW Assist eCall
- BMW TeleServices
- ConnectedDrive Services
- Connected Package Pro
- Enhanced USB & Bluetooth Plus Smartphone Integration
- BMW Curved Display
- Apple CarPlay & Android Auto Compatibility
- 4-Wheel Disc Brakes
- Emergency communication system: BMW Assist eCall
- harman/kardon® Speakers
- Auto High-beam Headlights
- Exterior Parking Camera Rear
- AM/FM radio: SiriusXM
- Compass
- 16 Speakers
- Speed-Sensitive Wipers
- Auto-dimming Rear-View mirror
- Front beverage holders
- Variably intermittent wipers
- Turn signal indicator mirrors
- Trip computer
- Traction control
- Tilt steering wheel
- Telescoping steering wheel
- Steering wheel mounted audio controls
- Sport steering wheel
- Split folding rear seat
- Speed-sensing steering
- Speed control
- Security system
- Remote keyless entry
- Rear window defroster
- Rear reading lights
- Rear anti-roll bar
- Rear air conditioning
- Rain sensing wipers
- Radio data system
- Power windows
- Power steering
- Power passenger seat
- Power driver seat
- Power door mirrors
- Passenger vanity mirror
- Passenger door bin
- Panic alarm
- Overhead airbag
- Outside temperature display
- Occupant sensing airbag
- Memory seat
- Low tire pressure warning
- Knee airbag
- Illuminated entry
- Heated front seats
- Heated door mirrors
- Garage door transmitter
- Fully automatic headlights
- Front reading lights
- Front dual zone A/C
- Front anti-roll bar
- Four wheel independent suspension
- Dual front side impact airbags
- Dual front impact airbags
- Driver vanity mirror
- Driver door bin
- Delay-off headlights
- Bumpers: body-color
- Brake assist
- Automatic temperature control
- Auto-dimming door mirrors
- Alloy wheels
- Adaptive suspension
- ABS brakes
- Tachometer
- Spoiler
- Navigation System
- Leather Shift Knob
- Front Center Armrest
- Front Bucket Seats
- Electronic Stability Control
- Air Conditioning
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.